Air Scoop Assembly

zetec - 47

Air scoop backing plate in position. The hole at the center top is the mounting position for the air temperature sensor.

 

zetec - 48

Trumpets are refitted once the backing plate is in place.

 

zetec - 49

Air scoop in place.

The air scoop is shown here. The backing plate (not shown), restrictor (not shown), debris tube, mounting hardware, filter and .430 inch air bleed (none of which are shown in the photo) are required by the GCR.

Quicksilver is the source. $695.

 

Next Chapter: Exhaust Header